What is an MPPT Charge Controller?
An MPPT charge controller regulates a fluctuating power source prior to redirecting it to the batteries. It prolongs the battery life and reduces the charging time.
An MPPT charge controller regulates a fluctuating power source prior to redirecting it to the batteries. It prolongs the battery life and reduces the charging time.
Is the rule of sixths better than the Oceans and Fisheries “rule of twenthieths” for manually calculating tides? Here is the punchline: they both yield similar results.
I describe how Yves Gélinas taught me to step the mast on Jean-du-Sud. The approach takes a day and no additional equipment… if the boat is properly configured.
I have finished Jean-du-Sud’s power train install. I answer why I chose a Beta Marine 20, detail the unforeseen costs and analyze the install time.
This text is about useful knowledge that should be understood prior to a power train install. It reduces the installation time and saves money.
This video helps understanding how to finish an (underwater) epoxy job.
This post is my answer to the following question: why was so much extra-time required for the install? I list out seven elements related to the power train install that had an impact on the required time.
An update on paper charts carryage requirements in the UK, France, Germany, the USA and Canada.